Werner Baller
1 |
2 |
Mining Services
Solutions for problem chute systems
Chute supplier Weba Chute Systems has been approached by gold miner Eldora Gold to provide solutions to the company’s Kisladag mine’s problematic chute system.By: Beth Shirley
29th May 2009
Mining Services
Engineering company takes bulk materials handling to new heights
Custom designer of transfer point solutions, Weba Chute Systems is performing well at the privately owned Letseng diamond mine, having clinched an order to supply four more Weba Chutes to the world�s highest diamond mine.By: Jonathan Faurie
28th September 2007
ANGLO PLATINUM PROJECTS
Local manufacturer clinches R10,5-million order
Bulk materials handling systems manufacturer Weba Chute Systems of Wadeville, Johannesburg, has clinched a R10,5-million order for its patented transfer point system for Anglo Platinum�s (Angloplat�s) Potgietersrust Platinums (PPRust) North...By: Chanel de Bruyn
22nd June 2007
Mining Services
Chute system reduces wear and tear
Transfer points into mill feed or scrubber feed chutes are traditionally high wear and high maintenance installations. However, this need not be the case.By: Chanel de Bruyn
1st June 2007
Breaking News
Chute system completed for Samancor
The installation of a Weba Chute System at Samancor's train loading station at Meyerton has removed the double handling of product and reduced degradation of material while also improving the blending of material, says Weba.By: Nicola Mawson
20th January 2006
Mining Services
Company provides clients with correct transfer chute solutions
There is an increasing trend in the South African mining sector whereby process engineering companies that offer turnkey materials-handling solutions are awarded contracts for the complete design, procurement and construction of new mining and...By: Jade Davenport
30th September 2005
Materials-Handling and Logistics
Increase in demand for local chute systems
Extracting mineral resources cost effectively remains a challenge throughout the world and the transfer of this material forms part of the challenge, Weba Chute Systems MD Werner Baller reports.3rd June 2005
Maintenance
Increasing conveyor-belt life
Conveyor-belt life can be extended by up to three or four times if transfer points are controlled correctly.By: peter cromberge
4th March 2005
Coal
1 000 custom chutes in operation
High wear at transfer points at collieries dramatically escalates maintenance expenditure, and yet, according to Weba Chute Systems MD Werner Baller this is one of the areas where solutions are readily available.?By: andrea marais
10th September 2004
Diamonds
Northern Cape mine installs chute system
The need to reduce maintenance costs and eliminate belt loading problems was the primary reason why a diamond mine on the Orange river, in the Northern Cape, decided to replace the existing transfer points with Weba Chute Systems on its diamond...By: andrea marais
11th June 2004
Mining Services
Ore chutes tailor-made for Modikwa
Modikwa Platinum Mine in the Limpopo Province, a joint venture between Anglo Platinum and the black economic empowerment company African Rainbow Minerals (ARM), selected locally manufactured Weba Chute systems for all transfer points, Mining...By: zeena isaacs
9th May 2003
Mining Services
Combating transfer-point wear
High wear at transfer-points escalates maintenance expenditure on a mine dramatically, yet this is one of the areas where solutions are readily available, states MD Weba Chute Systems Werner Baller.By: Helene Le Roux
7th March 2003
1 |
2 |
Advertisement
Topic Multimedia
Second Take: New mining technologies
Resources Watch
New technology potential game changer – AngloGold
Mozambique gold project advancing – Auroch
Dynamics of mining industry changing – Auroch
AngloGold Ashanti to cut $500m costs, sell Navachab, suspend Mongbwalu
Mining doomed if ‘crazy’ pay increases continue – Nick Holland
Second Take: Botswana–SA coal rail link
Resources Watch
Second Take: New mining technologies 
Resources Watch 
New technology potential game changer –... 
Mozambique gold project advancing – Auroch 
Dynamics of mining industry changing – Auroch 
AngloGold Ashanti to cut $500m costs, sell... 
Mining doomed if ‘crazy’ pay increases... 
Second Take: Botswana–SA coal rail link 
Resources Watch 
Underground coal gasification has key role to play in Southern Africa
WDC hopes to resolve Zim diamonds issue at upcoming KP meeting
Anooraq focusing...
Tanzania's Jengo wants mine listings on African exchanges
Wits Gold plans...
London Mining...
Tungsten-miner...
Kebble R1bn unlocked as JCI/R&E/Investec/Letseng settle
Geovic confident on Cameroon cobalt project financing
Underground coal gasification has key... 
WDC hopes to resolve Zim diamonds... 
Anooraq focusing on doubling output... 
Tanzania's Jengo wants mine listings... 
Wits Gold plans to move De Bron into... 
London Mining expects iron-ore prices... 
Tungsten-miner Malaga mulls 2nd mill,... 
Kebble R1bn unlocked as... 
Geovic confident on Cameroon cobalt... 
Advertisement



















